Precautions for storage of Guangxi steel structure materials

2021-01-05 11:11:45
Times

When storing and installing Guangxi steel structure materials, you must pay attention to the following matters to ensure the safe use of steel structures.


A sign should be set up at the end of the steel, and the sign should indicate the specification, steel number, quantity and material acceptance certificate number of the steel;


Before installation, the construction unit shall conduct a special inspection of the product certificate, design documents and pre-assembly records of the components, and re-inspect and record the dimensions of the components;


The steel structure shall adopt appropriate connection methods to make the joint design consistent with the simplified structural calculation model;


After the steel structure is hoisted in place, the supports and other connecting components should be fastened in time to ensure the stability of the structure;


When working at heights use tools, spare parts should be put in the tool bag and not thrown up or down;


When working in rainy weather, reliable anti-skid measures must be taken, and lightning protection must be paid attention to during the thunderstorm season;


When the steel structure is hoisted, proper measures should be taken to prevent excessive bending and torsion deformation, and the rope buckle should be in contact with the component.


When stacking in the open air, the site should be level and higher than the surrounding ground, with drainage ditches around;


When stacking, the back side of the steel section should be upward or outward as far as possible to avoid snow and water accumulation, and there should be a height difference at both ends to facilitate drainage;


Place pads to prevent damage to the components;


The weather conditions are also optimistic before construction, and operations are prohibited for winds above level 4.