广西钢结构_广西钢结构加工_广西钢结构厂
NewsNews
contact uscontact us
Guangxi Mingang Steel Structure Construction Co., Ltd.

ADD: 

China-ASEAN Youth Industrial Park, Quli Town, Fusui County, Chongzuo City, Guangxi ,China PRC

TEL: 

+86 771 7685530  

+86 771 5878305    

FAX: 

+86 771 5878305

Company registration place and main production base:

Guangxi China-ASEAN Youth Industrial Park

TEL: +86 771 7685530

URL: en.gxmggg.com

your current location : home >> News >> Industry News

Common problems of welding in steel structure plants and precautions for maintenance after completion

2021-01-12 15:12:51
Times

Guangxi steel structure workshop mainly means that the main load-bearing components are made of steel. Including steel pillars, steel beams, steel structure foundations, steel roof trusses (of course, the span of the factory building is relatively large, and it is basically steel structure roof trusses now), steel roof, note that steel structure walls can also be maintained by brick walls. Due to the increase in steel production in my country, many steel structure workshops have begun to be adopted.


The process of building a steel structure workshop is very complicated, and the welding process is one of the important processes. The welding process is a concealed project, and it is one of the processes that requires high construction quality. There are two problems that are prone to occur in the process of welding steel structure workshops:


The weld repair rate is very high due to the welding quality. Secondly, due to improper operation of the previous process and technical problems of the operators, the quality of the welds is caused.


Because the above problems are the main problems that directly affect the quality of the project, this type of problem can only be detected and judged through the use of professional inspection tools by professional inspection companies.


For the cost of steel structure factory buildings, we usually consider several points: one is the material cost; the other is the cost is related to the span of the plant; the third is the labor cost of the plant and the technical cost of the plant.


How to maintain the steel structure workshop after completion:


Steel structure workshops must be cleaned and maintained regularly, and routine inspections are generally required at least once a year to discover potential problems in steel structure workshops.


If the metal plate surface of the steel structure workshop is found to be damaged, it should be repaired in time to avoid corrosion of the metal plate surface in the sun and rain. If necessary, all high-elastic nano-materials can be used to protect the metal roof panel of the steel structure, and play an effective role of waterproof and heat insulation, and save energy for the indoor air-conditioning of the steel structure workshop.


The external wall cleaning of the steel structure factory building depends largely on the environment at that time. When cleaning the surface, you must be careful not to leave scratches. Avoid using abrasive detergents and bleaching ingredients. Steel balls and wear-resistant products are not allowed. Rinse with clean water from top to bottom.




广西钢结构加工

Guangxi Steel Structure Factory prompts the content source network, if there is any infringement, please contact the administrator to delete it, thank you!


Recently Viewed: